Life Science

The life science and pharmaceutical industries are seeing rapid growth and have come to rely on

Total Facility Solutions' (TFS) specialty contractor services for the planning and building of biopharmaceutical and biotechnology development facilities, laboratories and manufacturing installations. These types of installations require the most attention to site requirements and adherence to compliance because of the strict laws and regulations relating to the biopharmaceutical markets. With TFS recognized as a market leader in specialty cleanroom design, biopharma manufacturers turn to TFS for installation of clean utilities, high purity piping systems, process tools, mechanical and HVAC equipment.

 

Services Include:

  • Turnkey process systems
  • Clean utilities
  • cGMP hygienic process piping systems
  • Tool and equipment installation
  • Instrumentation & controls installation
  • Mechanical/HVAC installations

 

20,000 SF Facility with Dedicated Hygienic Fab Shop 

 

Our Burlington, NC off-site fabrication facility is designed and dedicated specifically to the life science market sector, operating in strict accordance with the industry standards required to manufacture hygienic process piping systems that assist our customers in meeting their FDA validation protocols.

 

Specifically, this location supports our current life science customers with hygienic and high-purity piping fabrication, stainless steel skid fabrication and serving as a hub for deploying TFS field installation teams. The Burlington facility has the ability to support prefab as well as offsite projects, which allows us to work in a controlled environment, while ensuring our customers a high-quality product using more cost-effective resources. 

 

Sample Projects:

 

Viral Pilot Plant (VPP) Project

  • Schedule: 2011- Present
  • Services: Clean Utilities, cGMP Hygienic Process Piping Systems
  • Project Size: 44,000 SF facility
  • Benefits: Provided owner with cost saving ideas; Flex scheduling to accommodate long-lead capital equipment

 

Biopharmaceutical Cell Culture Facility

  • Schedule: 2008-2009
  • Services: Clean Utilities, cGMP Hygienic Process Piping Systems
  • Project Size: 750,000 SF greenfield bulk biologics manufacturing, bio-reactor capacity, manufacturing, central utility
  • Benefits: To mitigate local labor constraints, 3 off-site fabrication facilities were used to maximize prefabrication of piping to support extended, 2-shift on-site work schedule

 

 

 

Contact Us

info(at)tfs-us.com